Lisa Tyree

Building Siting Project

The Jōb Industrial Services C/S department was hired by a Western Region refiner to develop a TIC to examine multiple buildings in or around process units. Relocation or refurbish near or in the process units, will be required to bring up to current blast zone requirements.

Cooling Tower Project

Scope was to replace a wooden cooling tower that was several decades old and beginning to collapse at a Western Region refiner. Jōb was involved in the OSBL electrical & instrumentation as well as structural work. It was a critical project with extensive field investigation and required a lot of coordination with the cooling tower …

UP Railroad Piping Replacement Project

Jōb Industrial Services was contracted to eliminate above ground piping that was routinely damaged by vehicles on a bridge on a well-traveled road/highway. Jōb provided engineering and design and an underground solution to move product safely to the UP-Railroad fuel tank in Boise, Idaho.

Crude & FCC Wash Water Upgrades

Jōb Industrial Services was awarded the detail engineering by a south-central petroleum refining company to modify the existing wash water system at the Crude and FCC units that provided additional water to the overhead heat exchangers to improve equipment reliability.

Turnaround Support

Jōb Industrial Services provided a mechanical and electrical engineering team to assist a Western Region refiner with development Turnaround packages. Once completed, the packages were issued to the site contractors for execution.

Boiler Upgrades

The main boiler plant at a Rocky Mountain Region refiner has been in continuous operation for many decades. It was determined that a major outage was necessary to change main steam header valves and piping. Jōb Industrial Services provided engineering and design support to the maintenance group responsible for the execution of the work.

Crude Unit Debottlenecking

The process group at Jōb Industrial Services performed extensive HYSYS modeling to understand required modifications to increase crude throughput from 30,000 BBL/day to 40,000 BBL/day for each Crude Unit operating train, for a south-central petroleum distributor.

550 GPM Amine Unit Project

Jōb Industrial Services performed the process design, 3-D detail design and procurement of major equipment and instrumentation. Jōb Industrial Services provided operator training and start up assistance for this Western Region refiner.

32,000 CFM Belco Scrubber Project

Jōb Industrial Services was contracted to perform ISBL balance of plant and OSBL engineering (process, detail design, PLC/DCS) and construction for a Rocky Mountain Region refiner.

225,000 SCFH Flare Gas Unit Project

Jōb Industrial Services executed the detail engineering and procurement contract for a 225,000 SCFH FGRU at an East Coast Region refiner. Jōb also provided PLC/DCS integration, trained the plant personnel, and provided start-up assistance.