JEPCO provided engineering support to develop a high-level TIC to increase storage capacity of Black Wax. The scope was to repurpose existing tanks and then to also develop cost to construct for 3 new 120,000 BBL tanks and associated equipment, piping, and electrical to increase storage capacity. A new truck unloading rack was constructed in order to take advantage of blending opportunities. Deliverables for this project included: P&IDs, Plot Plans, Data Sheets, Heat Loss Calculations, Electrical Loads and Single Lines, Instrument Data Sheets and TIC Estimate.