A large Midwest logistics company requested engineering support to develop a high-level TIC to increase storage capacity of Black Wax. The client had one Black Wax storage tank located in the refinery tank farm (RTF). The scope was to develop cost to construct 3 new 120,000 BBL tanks and associated equipment, piping, and electrical to increase storage capacity of Black Wax in a remote tank farm located across an interstate highway approximately 4000 ft away. This allowed the client to take advantage of blending opportunities.
Deliverables for this project included:
- P&IDs
- General Plot Plan Showing Tank Layout in RTF
- General Pipe Routing from Original Tank to RTF
- Mechanical Data Sheets
- Heat Loss Calculations
- Electrical Loads and Single Lines
- Instrument Data Sheets
- TIC Estimate
The Jōb key employee engineering team included:
- Project Manager
- Process Engineering
- Mechanical Engineering
- Civil/Structural Engineering
- Electrical & Instrumentation
JEPCO understands the importance of how a team approach has a positive effect on the overall success of a project. We analyze each project individually and assign a team that will have the most impact on all the aspects of the project. Doing this allows us to be able to identify and meet the needs of our client while keeping safety, cost, and schedule as major considerations. With the right staff and the right experience, JEPCO was able to reach these goals and directly impact the overall effectiveness and the economic growth of their operation.
A large Midwest logistics company requested engineering support to develop a high-level TIC to increase storage capacity of Black Wax. The client had one Black Wax storage tank located in the refinery tank farm (RTF). The scope was to develop cost to construct 3 new 120,000 BBL tanks and associated equipment, piping, and electrical to increase storage capacity of Black Wax in a remote tank farm located across an interstate highway approximately 4000 ft away. This allowed the client to take advantage of blending opportunities.
Deliverables for this project included:
- P&IDs
- General Plot Plan Showing Tank Layout in RTF
- General Pipe Routing from Original Tank to RTF
- Mechanical Data Sheets
- Heat Loss Calculations
- Electrical Loads and Single Lines
- Instrument Data Sheets
- TIC Estimate
The Jōb key employee engineering team included:
- Project Manager
- Process Engineering
- Mechanical Engineering
- Civil/Structural Engineering
- Electrical & Instrumentation
JEPCO understands the importance of how a team approach has a positive effect on the overall success of a project. We analyze each project individually and assign a team that will have the most impact on all the aspects of the project. Doing this allows us to be able to identify and meet the needs of our client while keeping safety, cost, and schedule as major considerations. With the right staff and the right experience, JEPCO was able to reach these goals and directly impact the overall effectiveness and the economic growth of their operation.