JEPCO completed an engineering study for debottlenecking the older of two sulfur plants at a Great Plains Region refiner. Included were new burner and thermal reactor specifications for oxygen enrichment. A new thermosiphon waste heat boiler with steam drum was also specified. Evaluations of the existing tail gas unit were also included.