JEPCO provided detailed engineering services to replace their 1960’s vintage double ended substation at a Rocky Mountain Region copper facility. This mountain side substation provides electrical power to crucial mining operating equipment that operates 24/7. As part of the engineering design, JEPCO developed detailed construction sequencing plans to reduce power outages to a minimum while also considering the safety risks of executing construction activities in close proximity to an operating substation.